August 6, 2026

Financing Saudi Arabia’s Data Center Build-Out

DOWNLOAD THE FULL REPORT

A CAPITAL STRUCTURE BLUEPRINT FOR SPONSORS AND CFOs

Saudi Arabia’s installed data center footprint carries roughly 410 MW of IT load capacity across some 40 operating facilities, and is forecast to reach approximately 1 GW by 2030, growing faster than any other market in the region. That forecast, however, is only a fraction of its announced ambition.

HUMAIN, the Public Investment Fund’s national artificial intelligence company, has been reported as targeting 6.4-6.6 GW of data center capacity over the coming decade, through a combination of its own facilities and leased capacity from other operators1. Its first sites in Riyadh and Dammam each launch at an initial capacity of at least 100 MW2. Its joint venture with stc’s center3, in which HUMAIN holds 51% and center3 holds 49%, begins at 250 MW and targets up to 1 GW3. DataVolt committed $5 billion to a 1.5 GW campus at Oxagon in NEOM. AWS is investing $5.3 billion to develop a new infrastructure region in the Kingdom4. Across the GCC, MEED tracks more than 174 active and planned data center projects with a combined value above $93 billion5.

The demand case is increasingly well established. Three forces underpin it: 

  • A cloud-first public sector mandate underpinned by data sovereignty and personal data protection legislation; 
  • Hyperscalers that increasingly lease rather than build in new markets; and 
  • AI workloads whose economics depend on the cost and availability of power, which is a comparative advantage the Kingdom is building its pitch around. 

On the installed base above, Saudi Arabia carries roughly 12 watts of data center capacity per capita (assuming a population of ~34m). The UAE, ~510 MW6 against ~10m people, and the United States, at 17.2 GW7 against ~340m, both are close to 50 watts, which is roughly four times the Saudi figure. This level of under penetration, in a market with this much capital behind it, is a build-out waiting to be financed.

Critically, much of the build is a private-sector build. Capacity is increasingly being developed by third-party operators and specialist developers—DataVolt, center3, Khazna, ezditek, Sahayeb and others—rather than by the end users consuming it. That shift transfers the balance sheet burden from users to sponsors, and from equity to debt.

Accordingly, bankability is becoming the principal consideration on the Kingdom's data center build-out, rather than land, power, or demand. 

SIZING THE CAPITAL CALL

Two trajectories, two very different financing tasks

On published benchmarks of approximately $11-14 million per MW of IT load for shell, core and mechanical and electrical plant before any IT hardware8, the capital requirement could be either one of two very different numbers depending on which trajectory the Kingdom follows. 

Note that these are global benchmarks; Saudi power costs and construction labor could put the Kingdom at the lower end of that range, and a Kingdom-specific basis should be substituted where available.

  • Base case. Growth from roughly 410 MW to approximately 1 GW of IT load by 2030 implies around 620 MW of incremental capacity, or $7-9 billion of project capital. At 50-75% gearing, that is $3.5-7 billion of debt which is less than 1% of Saudi banks’ SAR 3.4 trillion private-sector loan book9, and well inside what the market has absorbed for a single sector before.
  • Announced delivery case. If even half of the publicly announced pipeline is energized by 2030 - in the order of 2.5-3 GW—project capital cost rises to $28-42 billion and the debt requirement to $14-32 billion. Absorbing that would require broader syndication than Saudi banks have previously assembled for this sector and would open real space for institutional capital alongside them. 

The difference between these two scenarios highlights the financing challenge. It will not be closed by announcements, land allocation, or power availability, all of which the Kingdom has. It will be closed (or not) on a project-by-project basis, on whether individual assets are structured in a way that debt capital providers can underwrite.

Data center capital is not being raised in isolation. A Vision 2030 project finance pipeline of $100–150 billion is competing for the same lender balance sheets and the same credit committee approvals

THE FRAMEWORK

Data center financing, particularly as it relates to debt, in the Kingdom has faced the predictable challenges: 

  • Sponsors approaching lenders without signed offtake agreement
  • Retained delivery risk where it should have been transferred, and 
  • Capital stacks optimized for the first drawdown rather than the life of the asset

Three levers determine whether a project reaches financial close on terms worth having, and they operate in sequence, not in parallel.

Contract

Bankability is a commercial outcome, not a financing one

Lenders primarily underwrite contracted cash flows rather than market forecasts. Securing an investment-grade or sovereign-linked off taker before financing, sizing to the contracted term, and structuring contracts with appropriate commercial protections strengthen bankability and determine gearing, tenor, margin, and the treatment of cash flows.

Construction

Risk transferred is risk priced

Delivery is where sponsors protect their equity return. Fixed-price, date-certain contracts, grid connection as the critical path, phased deployment of mechanical and electrical plant against contracted megawatts, and early certification help transfer construction risk, protect equity returns, and support the financing timetable.

Capital

Structure for the life of the asset, not the first drawdown

The cost, tenor, and durability of capital are determined by structuring decisions made at the outset. Sequencing the capital stack, pricing the balloon on day one, using the sukuk market where appropriate, and running bank and private credit in parallel help optimize financing, improve flexibility, and support the asset throughout its lifecycle.

NEXT STEPS

Immediate priorities for sponsors and CFOs

Priorities will vary by asset and by stage. These five actions consistently separate the projects that reach financial close on competitive terms from those that stall in diligence.

Secure the anchor before approaching the lenders

Contracted megawatts set off the leverage; forecast megawatts do not. Going to market without the offtake signed risks pricing, structure, and sometimes the financing itself

Build a lender-ready base case

Utilization, lease rate, power cost, and ramp-up are the four variables lenders will stress. Independent validation of the business plan shortens diligence and removes the discount applied to sponsor forecasts

Design the full capital sequence at the outset

Construction, stabilization and refinancing are one decision, taken once—not three taken under time pressure

Put grid connections on the critical path

Energization sets the clock on revenue recognition, drawdown and the first cover ratio test, which makes it a financing milestone, not just a construction one

Test more than one capital market

Bank, sukuk and private credit price this risk differently. Running them in parallel is the cheapest form of price discovery available to a sponsor

CONNECTING THE 3 Cs

Contract, construction and capital compound. A stronger offtake supports higher gearing, which shortens the equity cheque; transferred delivery risk supports longer tenor, which lowers annual debt service; a sequenced capital plan turns both into the ability to commit ahead of demand. Sponsors who treat them as one agenda finance better than those who run them as three. 

Saudi Arabia will build the capacity. The open question is who finances it, on what terms, and which sponsors retain their returns through the cycle. Capital is not the constraint. Structuring assets to receive them at this scale is new work in the Kingdom, and the sponsors who do it first will set the terms.

HOW CAN A&M HELP

A&M's Debt & Capital Advisory practice in the Middle East advises corporates, family groups, developers, financial institutions, and sponsors across the GCC and Africa on raising, restructuring, and optimizing capital. Combining international capital markets execution with on-the-ground regional presence, we support clients across capital raising and advisory, project and infrastructure finance, refinancing, capital structure optimization, debt restructuring, covenant advisory, special situations and stressed financing, and financing readiness.

Contact Us.

I acknowledge that A&M will process my personal information in accordance with its Privacy Notice.